                      | 1. Fixing of steel studs |  | 2. Cutting of steel stud using simple cutting tool |  | 3. Completed steel stud frame | 
                    
                      |  |  |  |  |  | 
                    
                      |  |  |  |  |  | 
                    
                      | 4. Cutting of ConcritBoard using electric cutting tools
 |  | 5. Alternatively, cut ConcritBoard using pen-knife |  | 6. Fixing of ConcritBoard onto steel stud using battery drill & self-drilling screws | 
                    
                    
                      |  |  |  |  |  | 
                    
                      |  |  |  |  |  | 
                    
                      | 7.Running electrical services inside wall partition |  | 
                        8. Install RockWool(if requiring acoustic & fire rating properties)
 |  | 9. Patching up joints with cementitious-based mortar
 | 
                    
                    
                      |  |  |  |  |  | 
                    
                      |  |  |  |  |  | 
                    
                      | 10. Reinforcing joints with a layer of fibermesh
 |  | 11. Smoothing the surface using recommended skim coat material
 |  | 12. Laying tiles on ConcritBoard using normal tile adhesive (Fibermesh and skim coat can be obseleted for wall-tiled surface) | 
                    
                      |  |  |  |  |  |